In the 1990s, North Tide Marine Power Plant pursued new equipment, and veteran technician Chandler Hale was excluded from the new crane training. He purchased the decommissioned H-17 lifting vehicle with his own savings. His wife Luna Hale was deeply worried about the depleted family funds, while his colleague Jake Lane dismissed the outdated equipment. When foreign trade ship engine orders faced critical obstacles from factory doorway dimensions and ground conditions, the expensive new crane was unable to operate. Chandler Hale partnered with retired senior squad leader Jasper Roth, relying on the crane and balanced lifting beam that were dismissed as scrap metal, and successfully completed the lifting task on schedule after overcoming multiple hazards including rainstorms and equipment malfunctions. This incident prompted the factory to recognize the value of traditional technical expertise, corrected the flawed practice of prioritizing new equipment above all else, and Chandler Hale established a dedicated lifting team, achieving perfect alignment between his professional craftsmanship and the era's production demands.